![]() ![]() Send corrections and additions to the Standard Drawings team. Can be tied to 202(A) UNCLASSIFIED EXCAVATION, 202(D) UNCLASSIFIED BORROW, when no cross sections are included with plans. TO BE USED IN A MANNER APPROVED BY THE ENGINEER, FOR MISCELLANEOUS GRADING. Can be tied to many pay items at the discretion of the designer. Standard Drawings are not currently available for download from the shaded states.Īll links are subject to change. SEE SECTION 109.01B OF THE STANDARD SPECIFICATIONS. DOWELS REQUIRED FOR PCC PAVING 8 THICK, OR GREATER, IN ACCORDANCE WITH STANDARD. The document is useful for engineers, architects, contractors, and developers who need to comply with the city's drainage and. The document is part of the city's adopted building codes and standards for public works and development projects. ![]() ![]() 2.02 Product Manufacturer: The unit shall be a Model Accuron 2200 as. Drawings are available in various formats including PDF (Acrobat), DGN (MicroStation Design File), DWG and DXF (AutoCAD Drawing), and other image types (TIF, DPR). The webpage provides a PDF document of the City of Oklahoma City's standard design for storm sewer inlets, including dimensions, materials, and details. If concrete has been heat cured, detension while concrete is. See the state links below for available standard drawings. New: Two New Crash Cushion Standards and Two New Steel Barriers Applicable December 2021: memo0821.pdf: 02-24-21: New: Two New Short Radius Standards, Four New Concrete Barriers, One New AREF-21 Standard & One Revised CCCG-21 Standard Applicable July 2021: memo0221. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |